In this rented house water in the bathroom had got into places it shouldn’t have.  The chipboard floor had gone so soft under the vinyl flooring that the toilet was heading downstairs.  A complete new floor was required including some new steps into the shower.  note that the new vinyl flooring is laid under the toilet and not cut around it.  This means that in the event of a leak the floor underneath is still protected.